Shipment of the product by railway and road, covered transport, in accordance with the rules of cargo transportation.
Guaranteed shelf life is not less than 12 months.
Delivery is possible in the following containers: drums, IBC-containers, in bulk.
Request a quoteClay inhibitor prevents swelling of clays and shales, increases the efficiency of cleaning drilling fluid from drilled rock by reducing the rate of its dispersion.
- leads to a decrease in clay hydration due to interaction with polar particles of the borehole wall and the formation of a thin hydrophobic layer on its surface.
- ensures a decrease in the friction coefficient
- helps reduce the filtration of drilling fluid into the rock;
- ensures stabilization of the rheological parameters of dispersed systems of drilling fluids.