They are used to ensure gradual controlled destruction of the viscosity of the liquid, which is necessary for free filtration of the gel with its subsequent removal into the well; activators can be added if necessary; can be used as a breaker for additional cleaning of the bottomhole formation zone at the final stages of hydraulic fracturing.
Request a quote